Sandy Park Pedestrian Bridge

Contact Us
/ 01

Project Details

The Sandy Park Hotel in Exeter is to be built across Old Rydon Lane from the carpark and rugby ground. A linkspan bridge is required to connect the hotel to these facilities.

Our Role

CaSE were employed as permanent works designer and designed a steel footbridge using plate girders stabilized by U-frame action, an orthotropic steel deck plate and an architectural canopy. The 40-tonne, 27m x 4m structure, which was built locally in Newton Abbot and lifted into place by cranes during what a seven-hour operation. View the bridge installation time laps here.

Location
United Kingdom
Contractor
SIGMAT Ltd
Sector
Contact Us
/ 04

Services

  • Permanent Works Design
SEE ALL PROJECTS
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram