Sandy Park Pedestrian Bridge

Contact Us
/ 01

Project Details

The Sandy Park Hotel in Exeter was constructed across Old Rydon Lane from the car park and rugby ground. A linkspan bridge was installed to connect the hotel to these facilities.

Our Role

CaSE was employed as the permanent works designer and developed a steel footbridge using plate girders stabilized by U-frame action, an orthotropic steel deck plate, and an architectural canopy. The 40-tonne, 27m x 4m structure was built locally in Newton Abbot and lifted into place by cranes during a seven-hour operation.

View the bridge installation time-lapse here.

Location
United Kingdom
Contractor
SIGMAT Ltd
Sector
Contact Us
/ 04

Services

  • Permanent Works Design
SEE ALL PROJECTS
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram