Nossos negócios

Ponte Pedonal do Parque Sandy

Entre em contato conosco
/ 01

Detalhes do Projeto

The Sandy Park Hotel in Exeter was constructed across Old Rydon Lane from the car park and rugby ground. A linkspan bridge was installed to connect the hotel to these facilities.

Nosso papel

CaSE was employed as the permanent works designer and developed a steel footbridge using plate girders stabilized by U-frame action, an orthotropic steel deck plate, and an architectural canopy. The 40-tonne, 27m x 4m structure was built locally in Newton Abbot and lifted into place by cranes during a seven-hour operation.

View the bridge installation time-lapse aqui.

Localização
Reino Unido
Contratante
SIGMAT Ltda.
Setor
Entre em contato conosco
/ 04

Serviços

  • Projeto de Estruturas Permanentes
VEJA TODOS OS PROJETOS
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram