Joakim Dupleix has over 13 years’ experience in structural design specialised in bridge design and related construction equipment. He has experienced different aspects of the bridge life-cycle: tender to detailed design, large scale strengthening of existing bridges as well as construction methods optimisations of segmental bridges. He has experienced multiple advanced bridge construction techniques, and has designed heavy lifting machines and various temporary works for the erections of precast segment such as Lifting Frame and Launching Gantry.
Joakim also has been directly involved in the development of Geometry Control software ABES, and oversaw its application on various sites. Joakim has worked on projects all around the world and designed steel and concrete structures using the Australian, American and Eurocodes.
Joakim's Key Project Experience: